Skip to project experience

Project spotlight · Johns Hopkins

Two Johns Hopkins projects. Different kinds of partitions.

Our work at Johns Hopkins included an operable-wall project, followed a couple of years later by a separate job involving new HDPE toilet partitions.

Johns Hopkins

From our team’s experience

Two projects

Operable wall · HDPE toilet partitions

Our firsthand experience

First, an operable-wall job

We worked at Johns Hopkins on several occasions. One of those jobs involved an operable wall, part of our experience with room-dividing systems.

A couple of years later, new HDPE toilet partitions

On a later Johns Hopkins job, we installed new HDPE solid plastic toilet partitions. This was a separate project, a couple of years after our operable-wall work.

Together, the jobs illustrate the range of work in our project history: room-dividing systems and restroom partitions. We bring that firsthand experience to our conversations with customers.

Start your project with a clear scope

Identify the room, system and intended use when requesting a proposal. An operable wall and a toilet-partition package need different drawings and specifications, even though both may be described as partitions.

For restroom work, include the material, mounting style, layout, finish and hardware requirements. Our team can review your drawings and help define the package before an order is released.

Compare restroom partition materials Send your project drawings

Explore related experience

Education & healthcare

See the related project history

Planning guidance for a similar project

Define the system before asking for a partition quote.

Our Johns Hopkins work included an operable wall and, on a separate later job, HDPE toilet partitions. The shared word “partition” can hide very different scopes. Start your own project brief by identifying what the system needs to do.

For a room divider, describe both room arrangements

Show the opening and how the space should work when divided and when open. Identify where the panels will go when moved out of use, along with finishes and any specified acoustic or operating requirements. Bring the selected supplier into the support and layout review; a toilet-stall drawing cannot define an operable-wall package.

For restroom partitions, document each room

Provide finished dimensions, fixture locations, stall layouts, mounting, height, privacy and hardware requirements. Include cleaning practices and moisture exposure in the material discussion. Record the manufacturer and series once selected so the installation and maintenance documents match the actual order.

Agree how work fits the facility’s schedule

Identify which areas can be released for work, who controls access and how materials will reach them. If the building stays in use, agree the separation of work areas, permitted hours and any facility-specific controls with its team. These are questions to resolve for a new project, not assumptions about the historic Johns Hopkins jobs.

Bring this to your planning meeting

Two different starting briefs

Send the information for the system you need. Keep separate scopes identifiable even when they share a building.

Send your plans for review
Operable wall
Opening dimensions, divided/open room plans, panel-storage location, finishes and performance specification.
Toilet partitions
Restroom plans, finished dimensions, material, mounting, stall height, door swings and hardware.
For either scope
Site contact, drawing revision, access and delivery arrangements, target sequence and handover needs.

Questions before you order.

Does an operable-wall project use toilet partition pricing?

No. It is a different system and scope. Identify the opening, configuration and required performance for the room divider. Use restroom layouts and the selected material and mounting when requesting a toilet-partition quote.

What information should be kept for future repairs?

Keep approved drawings, manufacturer and series, hardware details, finish information and the care instructions with the room record. For an existing system, send photographs and identifying labels with the service question. That gives the supplier a starting point beyond the building name.

Planning references and next steps

Manufacturer references below are examples for planning a new project; they do not identify the products installed on the historical job. Use the documents for your selected system.

Your project is next

A familiar name.
A team you can talk to.

Bring us your room plan, product schedule or replacement question. We sell and ship throughout the lower 48 states and Washington, D.C., with regional installation in Maryland, D.C., Virginia, Pennsylvania and Delaware.

Send your drawings Build an instant quote Talk to our team: 800-298-9696
← All project experience

Names and historical logos identify organizations and locations in our project experience.